Can you cut through a floor joist to run plumbing?
Rerouting waste and vent pipes during a bathroom remodel often forces homeowners to cut into structural floor joists or top plates by more than fifty percent. This leaves them weighing whether to compromise their home's structural integrity or spend a weekend of hassle trying to work around old cast iron and tight framing.
Core Friction Pattern
Analysis of 2 peer accounts across online developer and community forums reveals that “Can you cut through a floor joist to run plumbing?” repeatedly surfaces due to edge-case mismatches between standard defaults and real-world environments. Standard troubleshooting frequently falls short, compelling practitioners to develop custom workarounds.
+5 alternative community-tested workarounds cataloged below.
What people tried
Every workaround mentioned in the threads below. We haven’t tested any of them — and nobody here is claiming they worked.
Found another way around this?
Share your steps and trade-offs so fellow engineers don't have to reinvent the wheel. No account required.
Can you cut through a floor joist to run plumbing?
- 1repairing the floor joistDid this help you?
- 2running it down the bay and cutting in a wye into the section below the floor joistsDid this help you?
- 3cutting the trunk line further back and starting plastic there instead of cutting joistsDid this help you?
- 4cutting the cast iron using a sawzall with a carbide bladeDid this help you?
- 5Bridging gaps using hardware like a steel tie to strap studs togetherDid this help you?
- 6Adding a second plate above the hole to bridge the gapDid this help you?
In their words
Unedited, grouped by where they were said, most upvoted first within each place, each linked to the thread it came from.
“My choices are to either go up with the 2" vent, core through the top plate, and be ok with taking out more than 50% of it, or go up with the required 3.5" and blow out an entire section of top plate altogether.”source ↗
“Which one is the way to go?”source ↗
Where this came up
People with this problem also raised
Related community dilemmas clustered by discussion consensus
How to install flooring around pipes and posts
Permanent obstacles like railing posts and plumbing cannot be undercut or moved, leaving gaps that are hard to finish cleanly. People try to solve this by custom fabricating hardwood escutcheons or filling the gaps with matching caulk, but these fixes often require trial and error to get right.
Do I need a structural engineer for a sagging floor beam?
Paying for a structural engineer feels risky when you are afraid of wasting money if a contractor's reinforcement recommendation is already sufficient for a visibly sagging, deteriorated beam. Additionally, major structural fixes like adding a steel L-shaped beam require a complete rebuild, which stalls out when an HOA refuses to approve the engineering work.
Converting a bathtub to a shower with a 1 1/4 inch drain
Older homes often feature 1 1/4-inch drain lines, but modern building codes require a 2-inch pipe for a new shower installation. Upgrading this line requires breaking into old cast iron plumbing, which stops homeowners from finishing their bathroom renovations without major structural work.
How do I connect a flanged boot to rectangular duct?
When trying to save money on HVAC repairs by adding new air return lines yourself, the main challenge is figuring out how to connect a factory-flanged boot to a rectangular run of duct using drives and cleats. Even when you have a plan for register placement, the rectangular end's factory flange creates confusion on how to properly join it to the main line.
How to install a vanity over floor pipes in a tight space
When water supply lines come up through the floor inside a tight alcove, you cannot simply drop the cabinet straight down over them. This leaves installers with almost no wiggle room to maneuver a heavy 48-inch vanity into a narrow opening without hitting the pipes.
Should I add plywood to a flexing subfloor or replace it?
Adding a second layer of 1/2-inch plywood over a flexing 3/4-inch subfloor can reinforce the wood and pull up valleys, but it raises concerns about building on top of a subpar structure rather than fully replacing it. This leaves you weighing whether to lay down an extra sheet with a primer layer or tear out the original 40-year-old flooring entirely.